(TheNewswire)
In addition, the remainder of all pending assays from the 2021-2022 winter drill program have been received; this will allow completion of a technical report at the Graal property.
Coquitlam, BC, June 27, 2022 TheNewswire – Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt") is pleased to provide the latest exploration results at its Graal nickel-copper-cobalt discovery in the Lac St-Jean region of Quebec.
Drilling Highlights:
NRC-22-26 intersected 5.80 meters of massive to disseminated sulphides with assay results grading 0.89% Ni Eq, 0.57% Ni, 0.41% Cu, and 0.08% Co from 135.00m to 140.80m.
Select assays within the composite graded up to 1.45% Ni Eq, 1.05% Ni, 0.43% Cu, and 0.11% Co over 1.00m from 139.10m to 140.10m.
An additional intersection further down the hole from 148.80m to 159.30m graded 0.19% Ni Eq, 0.10% Ni, 0.13% Cu, and 0.02% Co.
The drill hole is located approximately 100m from drill hole NRC-22-24 (News Release of April 4, 2022) where the Company intersected 1.20% Ni Eq, 0.72% Ni, 0.86% Cu, and 0.09% Co over 9.30m from 142.80m to 152.10m.
These two drill holes are located approximately 5km southeast from the area where the massive sulphides were first discovered in 2021.
The current drill campaign is still on-going and has been designed to test high-priority anomalies discovered from the most recent geophysical surveys. See Table 1 below for the assay data, Figure 1 for a core photo, and Figure 2 for a map of the drill hole location with respect to the recent TDEM geophysics grid.
"We're happy to finally receive all the pending assays from the previous drill campaign. This will allow us to move forward with the Technical Report for this property. Almost every drill hole has intersected disseminated to massive sulphides with nickel-copper-cobalt mineralization. We will continue exploration at Graal and plan to determine the extent of this nickel-copper-cobalt deposit. This property aligns with our vision of being an important supplier of battery metals for the EV market, and we are excited to see it develop," stated Matt Halliday, P.Geo., President, and COO.
The 6,113-hectare Graal property is one of 14 properties recently acquired in northern Quebec covering 31,201 hectares that are prospective for EV battery metals such as nickel, copper, and cobalt. (See February 16, April 21, July 22, November 15, 2021 and January 31, 2022 news releases). The drill program is currently being managed by Laurentia Exploration in association with GoldMinds Geoservices Inc.
Table 1: Key sample and assay details for drill hole NRC-22-26
HOLE ID
From (m)
To (m)
Length (m)
Ni (%)
Cu (%)
Co (%)
% Ni Eq (1)
NRC-22-26
135.00
140.80
5.80
0.57
0.41
0.08
0.89
Including
137.00
137.70
0.70
1.02
0.66
0.13
1.54
Including
139.10
140.10
1.00
1.05
0.43
0.11
1.45
NRC-22-26
148.80
159.30
10.50
0.10
0.13
0.02
0.19
Including
158.50
159.30
0.80
0.38
0.59
0.05
0.68
Please note: Intervals are core length and is presumed to be close to true thickness, with no capping applied, and using quartered core split. Bolded intervals are grade composites. NRC-22-26 was drilled at an azimuth of 115 degrees, dip of -50 degrees, and is located at UTM 386123E, 5520977N.
Note (1): %Ni Eq = %Ni+(%Cu X Cu Price/ Ni Price) + %Co X Co Price/ Ni Price) where Nickel is 33,000USD/t, Copper is 10,000USD/t and Cobalt is 81,500USD/t; source LME March 30, 2022.

Click Image To View Full Size
Figure 1: Core photo of NRC-22-26 with massive sulfides highlighted from 135.00m to 140.80m

Click Image To View Full Size
Figure 2: Location of drill hole NRC-22-26 within the TDEM geophysics grid
QA/QC
The core samples have been split in two with a rock saw. Half was sent to ALS laboratory in Val d'Or and the other half kept as witness core. Blank and standard were inserted in the sequence and are in line with expected values allowing the disclosure of the assay results.
Qualified person
The technical information in this news release has been reviewed by Claude Duplessis, P.Eng., GoldMinds Geoservices Inc. m ember of Québec Order of Engineers and a qualified person in accordance with National Instrument 43- 101 standards.
About Canada Silver Cobalt Works Inc.
Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.
In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.
The Company also has: (1) 14 battery metals properties in Northern Quebec where it has recently completed a nearly 10,000-metre drill program on the Graal property and an airborne VTEM geophysical survey is being conducted at it Lowney-Lac Edouard property; and (2) the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it will be exploring in 2022.
Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com
"Frank J. Basa"
Frank J. Basa, P. Eng.
Chief Executive Officer
For further information, contact:
Frank J. Basa, P.Eng.
Chief Executive Officer
416-625-2342
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Caution Regarding Forward-Looking Statements
This news release may contain forward-looking statements which include, but are not limited to, comments regarding future financings, if any, pursuant to the short form base shelf prospectus referred to above, and comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, future financings, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com .
Copyright (c) 2022 TheNewswire – All rights reserved.
News Provided by TheNewsWire via QuoteMedia
Canada Silver Cobalt Works Inc. (TSXV:CCW, OTCQB:CCWOF, FWB:4T9B) is a dual-focus silver and battery metals (nickel, copper, cobalt) exploration/development company with operations in Northern Ontario and Quebec.
These metals are all classified as energy metals involved in the electrification trend underway around the world and they will continue to be in demand for many years to come.
The Company has two major projects underway – Castle East and Graal – with exciting announcements in the coming weeks/months.
Upcoming Catalysts:
Fast-Tracking Silver Production (with cobalt by product)
Canada Silver Cobalt is following a fast-track development model towards producing silver along with battery metal cobalt as a byproduct – both 'energy' metals needed to advance the world's alternative energy future.
Instead of the traditional route taken by mining companies to stretch out development over many years in a series of steps – exploration drilling, then resource studies, then engineering studies, followed by permitting – Canada Silver Cobalt is doing all of these at the same time in what it describes as “real time" mine development.
As the Company conducts its drill program to increase resource estimates at its spectacular high-grade silver-cobalt deposit at Castle East, it also is doing the environmental studies and preparing the applications for permits to construct a ramp down to the 500-meter level in order to extract the very high-grade silver-cobalt it has discovered there. The Company is also working on the engineering for the ramp and organizing contractors for constructing the ramp when the permits are received. Once the high-grade material is extracted, the Company can use its 100% owned “mini-mill" facility nearby which during past mining in the area produced as much as 2.5 million ounces of silver annually for mining companies when it operated as a government facility in the 1900s.
If all goes well, Canada Silver Cobalt could be producing enough silver within two years to pay for the ramp construction in a very short time frame and also fund additional exploration/development of its properties. The Company is also working on optimizing its proprietary, environmentally-compliant Re-2Ox extraction process technology which has been proven in lab tests to produce cobalt sulphate (and nickel and copper sulphates) in line with the strict specifications manufacturers require for EV batteries.
The Company also has other initiatives underway that will advance its position in the precious and battery metals market including exploration of gold properties in Ontario and nickel-copper-cobalt properties in northern Quebec.
More information below and at the Company's website and in the Company's investor presentation at www.canadasilvercobaltworks.com
Canada Silver Cobalt Works Inc. (TSXV:CCW,OTCQB:CCWOF,FWB:4T9B) has 100% ownership of the past-producing silver-cobalt Castle mine and the 78 sq. km Castle Property with strong exploration upside in the prolific past producing Gowganda high-grade Silver Camp of Northern Ontario.
The Company's recent acquisition of the Temiskaming Testing Laboratories in Cobalt, Ontario, the only facility in the Northern Ontario Silver-Cobalt District that combines bullion pouring, bulk sampling, commercial assaying and e-waste processing, makes Canada Silver Cobalt a vertically integrated leader in Canada's Silver-Cobalt heartland.
This facility will also become the new home of Canada Silver Cobalt's 100 percent-owned Re-2OX Process, an environmentally friendly solution for producing technical grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations.
The company recently announced that it has engaged SGS Canada's Lakefield Testing Facility to design a Re-2Ox pilot plant which will eventually be located at the TTL facility. It has also contracted with SGS to test the Re-2Ox process for battery recycling.
A notable highlight of recent drilling on the property is the discovery in the Castle East Robinson Zone of massive native silver grades of up to 89,853 silver (2,621 oz/ton) over 0.3 meters, with intercepts also showing cobalt grades up to 2.2% Co. Further drilling has greatly expanded the potential scale of the discovery.
On May 28, 2020, the company announced a sizeable Maiden Inferred Resource estimate of 7.6 million ounces of high-grade silver grading an extraordinary 8,582 g/t (250.2 oz/ton) silver the highest grade silver resource in the world. The company plans to upwardly revise this resource estimate in Q1 2022 based on the 60,000-meter drill program underway and the discovery of seven new high-grade silver veins since the initial resource estimate (which was based on only one vein).
As of the end of January 2022, 55,000 meters of the drill program had been completed and additional drilling is underway, with results pending. The Robinson Zone is 1.5 km east of the Castle Mine's adit and two of its previous mine shafts when it was a past producer in the 1900s. The company intends to restart the mine and is proceeding with various work including permitting towards that goal.
Agnico Eagle Mines Limited (TSX:AEM) operated the Castle mine in the 1980s when it was considered to be the highest-grade silver mine in the camp with an average mining grade of 26 ounces per ton silver. In its history, the mine produced 9.6 million oz silver and 300,000 lbs of cobalt as a by-product.
CCW is in a good position to take high-grade ore and process it into silver bars at TTL. In its initial years in the Cobalt Camp, Agnico Eagle processed high-grade silver ore at the TTL bulk facility and poured 1.6 million oz of silver annually into bars using TTL's bullion furnace. Other companies also produced another 1 million oz silver per year.
Also in the works at CCW is the design, planning and permitting for a ramp going down to the extremely high-grade silver discovery in the Robinson Zone at Castle East at about the 500 meter level.
The ramp would provide two extremely important benefits: 1) it would provide the company a way to extract the very high-grade silver to process at TTL into silver bars and the revenue generation from that would be considerable and would help pay for the ramp; and 2) the ramp would actually be an important exploration tool since it would likely intercept vein systems as it cut through the rock and drill pods could be established in key locations to permit underground horizonal-fan drilling for exploration at a much lower cost than drilling from the surface.
The Castle mine has fully-permitted access for its underground workings, providing the company with a significant advantage when it comes to putting the mine back into production. CCW has used its adit access for underground drilling and bulk sampling on Level 1 in preparation to resume mining.
Underground drilling on Level 1 at Castle recently discovered an exceptionally high-grade silver-cobalt vein structure. Initial drill results include seven meters grading 2.28 percent cobalt, 261 g/t silver and 1.65 percent nickel, 2.54 meters grading 1.87 percent cobalt, 4,763 g/t silver, 1.29 percent nickel and 1.19 g/t gold and 0.60 meters grading 3.16 percent cobalt and 10,741 g/t silver.
In a surprising development, high-grade gold of up to 22.7 g/t was unexpectedly discovered – along with high-grade cobalt, silver and nickel – in underground drilling on Level 1 in late 2019 (results announced on January 3, 2020).
In addition to the company's exploration efforts, CCW is working on obtaining an amendment to its existing advanced exploration permit so the company can move ahead with its proposed tailings program. Recent testing of material from the Castle mine's historical tailings pond has returned a calculated head assay of 459 g/t silver and produced a high-purity flotation concentrate grading 18,486 g/t silver with an initial recovery of 70 percent.
The company's on-site proprietary gravity separation pilot plant has produced an 8.25 percent cobalt concentrate from a waste pile left by previous operators. Head grades of the material from the waste pile tested graded 0.390 percent cobalt and 1,905 g/t silver.
Canada Silver Cobalt Works is led by Chairman and CEO Frank Basa, who has over 30 years of global experience in mining and development as a professional hydro-metallurgical engineer with expertise in milling, gravity concentration, flotation, leaching and refining of silver, cobalt, gold and other metals. Basa is also responsible for developing the company's proprietary Re-2OX hydrometallurgical process, an environmentally-friendly approach to extracting metals without the need of a smelter.
The battery industry has specific criteria that needs to be met in terms of its materials. For lithium-ion batteries it is necessary for companies to produce a 20 percent cobalt sulfate with limited arsenic. Canada Silver Cobalt Works has been able to demonstrate that its Re-2OX process is capable of producing a battery-grade 22.6 percent cobalt sulfate meeting these industry specifications.
Canada Silver Cobalt Works' portfolio also includes the Beaver and Violet silver-cobalt projects, both past-producers in the Cobalt camp.
The 78 square-kilometer Castle cobalt-silver project is located in the historic Gowganda mining camp, 85 kilometers northwest of Cobalt, Ontario. The camp was responsible for more than 50 million ounces of high-grade silver production in the 1900s. Infrastructure on and near the property includes year-round access to roads, water, diesel power, three shafts and an adit.
Two geological trends have been identified on the property including a north-south trending Nipissing diabase intrusive, which is the typical host rock for silver-cobalt-nickel deposits in the area, and a potential gold trend along the Bloom Lake fault.
The project hosts the historical Castle mine, a former silver-cobalt mine that has reportedly produced 300,000 pounds of cobalt and 9.5 million ounces of silver. Historic underground ore grades averaged 25 ounces per tonne silver between 1923 and 1930 and 26 ounces per tonne silver between 1979 and 1989. The Castle mine's previous owner, Agnico Eagle, ceased production in 1989 due to low silver prices (in the range of US$6 per ounce).
The Cobalt camp is primarily comprised of cobalt veins that contain varying amounts of silver. In the past, miners focused on veins that contained high-grade silver and ignored the low-grade silver veins even though they contained high-grade cobalt. Cobalt was not considered important at the time and routine drill core assays only focused on silver content.
Despite the past-production at Castle, the property remains largely underexplored and may host several significant high-grade underground cobalt and silver deposits.
The previously discovered 800-meter Castle Golden Corridor zone is located about 1.7 kilometers from the Castle #3 shaft and has a geological setting similar to the past-producing Kirkland Lake deposit (40 million ounces of gold) located 75 kilometers to the northeast. The zone is highly prospective for high-grade hydrothermal-related gold systems with copper. The zone has been drilled to a depth of 300 meters.
Channel sampling work conducted at the Castle Golden Corridor zone in 2014 returned 2.2 meters grading 2.24 g/t gold and copper values as high as 1.03 percent. Canada Silver Cobalt Works has also identified a 725-meter-long, east to west-trending IP anomaly with an associated chargeability halo in this area.
Canada Silver Cobalt Works is the only company in the Cobalt camp to have fully-permitted underground access via an adit. This allows for easy entry into the mine for extracting bulk samples and exploratory drilling to target new discoveries. Access to the underground workings also speeds up the time to production as CCW won't have to spend time establishing the mine adits. Drilling from underground can also be less costly and provides greater probability of success. CCW has mapped previously discovered veins using its extensive database which contains all of the past drilling and mine workings from the early 1900s.
Throughout 2018 and 2019, Canada Silver Cobalt Works conducted underground drilling at the Castle mine. Twenty-five percent of the assayed holes returned high-grade intercepts of 1.77 meters grading 1.05 percent to 3.7 percent cobalt. Additional drilling highlights include:
Management is working towards the eventual construction of a state-of-the-art 600 tonne per day gravity flotation cyanidation mill at Castle or nearby.
An on-site pilot plant has produced an 8.25 percent cobalt concentrate from waste material. Head grades from the waste pile left behind by previous operators tested 0.390 percent cobalt and 1,905 g/t silver.
With the goal of realizing the company's vision of becoming a vertically-integrated leader in North America, Canada Silver Cobalt Works has acquired Temiskaming Testing Labs (formerly PolyMet Labs), an ISO-certified lab facility with mineral and precious metals processing located in Cobalt, Ontario.
The 23,000-square-foot facility provides bullion pouring, bulk sampling, commercial assaying and e-waste processing services to the numerous mining operations in the area. The facility is also capable of processing mixed computer boards through its shredder and ball mill to recover precious and base metals.
The building is located near the company's Castle and Beaver mines and will host Canada Silver Cobalt Works' headquarters and proprietary Re-2OX process.
The company has poured three 300-ounce silver bars in a proof-of-concept test at the facility. The test was able to prove that the Castle mine has the potential to produce silver as well as cobalt from the underground and surface waste material and tailings. The pilot plant at the Castle mine separated leaf silver and created a silver gravity concentrate from mineralized waste material. The concentrate and silver leaf were smelted at the lab before forming the bars.
CCW was also able to recover cobalt from the same mineralized waste material using its Re-2OX process. The recovered materials were then sent to SGS Lakefield to produce a cobalt sulfate.
The Re-2OX hydrometallurgical process is designed to recover multiple metals and elements from all types of feedstocks with varying chemistries. The process was developed by Canada Silver Cobalt Works CEO Frank Basa in conjunction with the National Research Council of Canada (NRC), Canada's premier scientific research organization.
To date, Canada Silver Cobalt Works has produced a cobalt sulfate in the lab and is working on developing other products for potential customers that utilizes the Re-2OX process. To this aim, the company has been conducting advanced-stage testing on the process with SGS Lakefield to determine the viability of recycling spent lithium-ion batteries. Canada Silver Cobalt Works believes that the Re-2OX process can help fulfill the demand for ethically-sourced cobalt, creating compelling opportunities in the battery and renewable energy sectors.
Re-2Ox Process Flowsheet
In May 2018, Canada Silver Cobalt Works announced that the Re-2OX process had successfully recovered 99 percent cobalt and 81 percent nickel from a composite of gravity concentrates. The process was also successful in removing 99 percent of arsenic, placing the company in a competitive position as battery manufacturers prefer to use cobalt with low arsenic contents.
Canada Silver Cobalt Works also owns two other highly-prospective properties in the Cobalt mining camp: the Beaver and Violet mines.
The Beaver silver-cobalt project is located in Ontario's historic Cobalt mining camp, adjacent to the former Timiskaming silver mine and approximately 80 kilometers southeast of the past-producing Castle mine. The project itself includes a former producer, the Beaver mine, which produced 7.1 million ounces of silver and 139,472 pounds of cobalt from 1907 to 1940.
High-grade mineralization has been repeatedly confirmed at Beaver. In 2017, selected hand-cobbed sample material at surface averaged 4.68 percent cobalt, 46.9 g/t silver, 3.09 percent nickel, 46.9 g/t silver and 0.08 g/t gold.
This follows sampling of historical waste rock and tailings at Beaver in 2013 that returned 7.98 percent cobalt, 3.98 percent nickel and 1,246 g/t silver.
Canada Silver Cobalt Works also holds the formerly producing Violet silver-cobalt mine located near the Beaver property in the Cobalt mining camp.
Cobalt rosettes in a quartz-carbonate vein at the Beaver Silver Mine
Frank Basa has over 28 years' global experience in mining and development as a professional hydro-metallurgical engineer with expertise in milling, gravity concentration, flotation, leaching and refining of silver, cobalt, gold and other metals. He is a member of the Professional Engineers of Ontario and a graduate of McGill University. Basa has been the Chairman, Chief Executive Officer and President of Granada Gold Mine Inc. since June 18, 2004.
Mr. Halliday first joined Canada Silver Cobalt late last year from Kirkland Lake Gold where he served as resource geologist. A graduate of Dalhousie University in 2007, Mr. Halliday honed his skills for almost eight years with SGS Geostat, known as global leaders in orebody modelling and reserve evaluation. In 2016 he was part of the SGS team that pushed machine learning into the geological realm and claimed top prize in the $1 million Integra Gold Challenge.
Mr. Suttie currently works with Marrelli Support Services as its President, possessing more than 20 years of experience, ten of which were in public accounting prior to his tenure with the Marrelli organization. Mr. Suttie specializes in management advisory services, accounting and the financial disclosure needs of the Marrelli group's public client base. Mr. Suttie also serves as Chief Financial Officer for a number of other junior mining and technology companies listed on the TSX-V and CSE, leveraging his skills and experience to become integral to the reporting issuers.
Dianne Tookenay holds a Certificate in Mining Law from the Osgoode Hall Law School, York University, a Joint Masters of Public Administration from the University of Manitoba, a Bachelor of Administration from Lakehead University and Native Band Management and Indian Economic Development Diplomas from Confederation College Applied Arts and Technology. Tookenay's experience, knowledge and deep roots within the First Nation communities will continue to add significant value to Canada Silver Cobalt Works' development efforts over the coming years.
Robert Setter is the former Senior Financial Editor for Report on Mining. He brings an extensive business, marketing and analysis background to the company, is a graduate of UBC and holds a BA in Economics. Setter serves as Corporate Research and Analytics for Granada Gold Mine Inc. since 2012.
Tina Whyte brings over 20 years of experience in the corporate and securities industry. Her expertise spans to areas of corporate governance, continuous disclosure, financing transactions, regulatory filings and compliance. Whyte holds corporate secretary positions with other publicly-listed companies.
Canada Silver Cobalt Works Inc. (TSXV: CCW) (OTCQB: CCWOF) (FSE: 4T9B) (the "Company" or "Canada Silver Cobalt") is pleased to announce that it has commenced a follow-up drill program at its Graal nickel-copper-cobalt property in the Lac St-Jean region of Quebec.
The minimum 5,000m drill program aims at testing the geophysical anomalies characterized by high conductance that were highlighted during a recent FL-TDEM geophysical survey (See news release April 19, 2022). The objective is to verify the continuity and the extent of the nickel-copper-cobalt mineralization and search for the zones with increased thickness. Laurentia Exploration Services is conducting the drill program.
Previous diamond drilling along with geophysical surveys at Graal identified several disseminated to massive sulphide zones with varying thickness up to 13.1m containing significant grades of nickel and copper and in addition lesser amounts of cobalt, platinum, and palladium. Drilling was paused earlier this year to allow for the reception of pending assay data and completion of the geophysical survey (See news release April 4, 2022).
"Our geological team is quite excited to resume drilling at Graal. Almost every drill hole so far has encountered disseminated to massive sulphides with strong nickel, copper, and cobalt mineralization. What we have already discovered at the property suggests that it has the potential to become an important part of the North American battery metals supply corridor. The current drill program will give particular attention to the geophysical survey's discovery of a large 1.7km by 850m anomaly characterized by high conductance which we will be testing with the drill bit," stated Matt Halliday, President, COO and VP Exploration.
In addition to the drilling, the Company is pleased to announce that it has engaged Archeo-Mamu under the direction of Jean-Simon Labbé to complete a field investigation on the property after a desktop study identified potential zones which could have the presence of artefacts. The Company will be pleased to provide the results of this independent investigation to the Pessamit Innu Council and other government entities at request.
At Graal, the geophysical survey program identified 9,475m of drilling targets in two levels of priority where an initial 5,070m were identified as a first priority, as indicated in the map and chart below. The initial drilling will focus on near-surface mineralization. The larger target indicated by the geophysical survey will be drilled at a later stage. 
Figure 1: Drill program location with priority table – labelling of zone subject to change
To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/2093/127417_39619abc744a58a7_002full.jpg
Qualified person
The technical information in this news release has been reviewed by Claude Duplessis, P.Eng., GoldMinds Geoservices Inc. member of Québec Order of Engineers and a qualified person in accordance with National Instrument 43-101 standards.
About Canada Silver Cobalt Works Inc.
Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.
In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.
The Company also has: (1) 14 battery metals properties in Northern Quebec where it has recently completed a nearly 10,000-metre drill program on the Graal property and an airborne VTEM geophysical survey is being conducted at it Lowney-Lac Edouard property; and (2) the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it will be exploring in 2022.
Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com.
"Frank J. Basa"
Frank J. Basa, P. Eng.
Chief Executive Officer
For further information, contact:
Frank J. Basa, P.Eng.
Chief Executive Officer
416-625-2342
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Caution Regarding Forward-Looking Statements
This news release may contain forward-looking statements which include, but are not limited to, comments regarding future financings, if any, pursuant to the short form base shelf prospectus referred to above, and comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, future financings, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/127417
News Provided by Newsfile via QuoteMedia
(TheNewswire)
June 6, 2022 TheNewswire – Coquitlam, BC, Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt) announces with great sadness the passing of its long-time director Jacques Monette. Jacques has been an integral part of Canada Silver Cobalt since 2008.
On behalf of the Board of Directors, management team and employees, we extend our deepest sympathies and condolences to Jacques' family. Jacques was an experienced career miner working across Canada and around the world for over 40 years and has been on the boards of several exploration companies over the years. Jacques' experience and enthusiasm was a key factor in Canada Silver Cobalt's initial underground activity at the Castle Mine and he was looking forward to being part of the mining team leading the charge on the Castle East ramp development and getting the "rock in the box". Jacques will be sorely missed by all those who knew him.
About Canada Silver Cobalt Works Inc.
Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.
In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.
The Company also has: (1) 14 battery metals properties in Northern Quebec where it has recently completed a nearly 10,000-metre drill program on the Graal property; and (2) the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it will be exploring in 2022.
Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com
"Frank J. Basa"
Frank J. Basa, P. Eng.
Chief Executive Officer
For further information, contact:
Frank J. Basa, P.Eng.
Chief Executive Officer
416-625-2342
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Caution Regarding Forward-Looking Statements
This news release may contain forward-looking statements which include, but are not limited to, comments regarding future financings, if any, pursuant to the short form base shelf prospectus referred to above, and comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, future financings, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com .
Copyright (c) 2022 TheNewswire – All rights reserved.
News Provided by TheNewsWire via QuoteMedia
(TheNewswire)
Coquitlam, BC TheNewswire – May 25, 2022 — Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt") announces that the Annual General Meeting was held today, Wednesday, May 25, 2022 and is pleased to report that all resolutions were approved. Resolutions passed are listed below.
1. The following individuals were re-elected Directors of the Company: Frank J. Basa, Matthew Halliday, Jacques Monette and Dianne Tookenay.
2. McGovern, Hurley, Cunningham, Chartered Accountants , were re-appointed as Company auditors.
3. Adoption of the Company's 10% rolling share option plan was ratified and approved.
The Board of Directors appointed the following officers of the Company for the ensuing year:
Frank J. Basa: Chief Executive Officer
Matthew Halliday: President & COO
Robert Suttie: Chief Financial Officer
Tina Whyte: Corporate Secretary
Frank J. Basa, Jacques F. Monette and Dianne Tookenay were re-appointed as members of the Audit Committee for the upcoming year.
About Canada Silver Cobalt Works Inc.
Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.
In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.
The Company also has: (1) 14 battery metals properties in Northern Quebec where it has recently completed a nearly 10,000-metre drill program on the Graal property; and (2) the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it will be exploring in 2022.
Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com
"Frank J. Basa"
Frank J. Basa, P. Eng.
Chief Executive Officer
For further information, contact:
Frank J. Basa, P.Eng.
Chief Executive Officer
416-625-2342
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Caution Regarding Forward-Looking Statements
This news release may contain forward-looking statements which include, but are not limited to, comments regarding future financings, if any, pursuant to the short form base shelf prospectus referred to above, and comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, future financings, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com .
Copyright (c) 2022 TheNewswire – All rights reserved.
News Provided by TheNewsWire via QuoteMedia
(TheNewswire)
The Eby-Otto property is located in a prime geological setting with mineralized veins identified at surface, and is proximal to both the Cadillac-Larder Lake Break and an existing high-grade gold mine.
Coquitlam, BC TheNewswire – May 10, 2022 – Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt: 4T9B) (the "Company" or "Canada Silver Cobalt") announces that it has recently completed a drone magnetic geophysical survey and has entered Phase 1 of its 2022 exploration plan for the Eby-Otto gold property near the town of Kirkland Lake.
The Company has outlined the planned three exploration phases at the property as follows:
Phase 1: The first phase will consist of an initial site assessment to determine the logistics of future operations and will provide the Company time to receive any pending surface exploration work permits that will be necessary. Surveying will be completed for key Standard Iron Bars (SIB), legacy claim posts, and access points to refresh select existing cut line grids. An overall geological assessment will be completed based on field work consisting of geological mapping, stripping key outcrops, and possibly further MMI geochemical or targeted and detailed ground geophysics if the technical team deems it necessary.
As part of Phase 1, the Company has recently concluded a drone magnetic survey on the entire claim package conducted by EarthEx Geophysical Solutions Inc. The DroneMag system they use provides an extremely high-resolution end-product and uses a proprietary automatic obstacle avoidance system which provides a smooth flight path to drape over taller trees and avoid obstacles. This allows the drone to fly as low as possible to achieve the highest possible resolution. It uses a proprietary navigation system that allows for longer range RTK (real-time kinematic) controlled autonomy which results in high quality, clean magnetic imagery. The survey was completed at a 25m line spacing which should allow for smaller structures, such as vein systems, to be resolved and visible.
Phase 2: The second phase of exploration will be based on the results from Phase 1 and will expand to include diamond drilling to intercept specific regional structures based on the initial geophysical data provided by the drone magnetic survey, historic geological data, regional geophysics, geological mapping, and existing electromagnetic (EM) surveys completed by geologist Doug Robinson prior to the Company's acquisition of the property.
Phase 3: The third phase of exploration will expand on the drilling and field work outlined in Phase 2. Once the 3D inversion of the drone mag survey is received and the data has been interpreted, the technical team will correlate this data with known mineralization that has been identified via field work to better refine the targets, and adjust the exploration accordingly.
The Company now has option agreements on contiguous properties covering 1,000 ha at Eby-Otto and the area, importantly, includes approximately 5km of strike length along the Eby-Otto Fault and along a major alteration trend (OGS OFR 6184). The property is within the Kirkland Lake gold district in northeastern Ontario and is located within 5km of Agnico-Eagle's producing, high-grade Macassa Gold Mine.
Matthew Halliday, P.Geo., President of Canada Silver Cobalt Works, states, "Our geological team is excited to get boots on the ground at Eby-Otto. It is a very promising land package close to a producing mine with outcropping mineralized veins already identified. With the recent drone-borne magnetic survey just completed, we will assimilate this information with known data and put our existing and pending exploration permits to use. We believe having a highly prospective precious metals play underway will be conducive in the current market to adding value for shareholders." 
Click Image To View Full Size
Figure 1: Location of property showing the overall claim package and locations of existing and pending drill permits.
Qualified person
The technical information in this news release was prepared under the supervision of Mr. Matthew Halliday, P.Geo., (PGO), President, COO and VP Exploration of Canada Silver Cobalt Works Inc., a qualified person in accordance with National Instrument 43-101.
About Canada Silver Cobalt Works Inc.
Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.
In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.
The Company also has: (1) 14 battery metals properties in Northern Quebec where it has recently completed a nearly 10,000-metre drill program on the Graal property; and (2) the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it will be exploring in 2022.
Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com
"Frank J. Basa"
Frank J. Basa, P. Eng.
Chief Executive Officer
For further information, contact:
Frank J. Basa, P.Eng.
Chief Executive Officer
416-625-2342
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Caution Regarding Forward-Looking Statements
This news release may contain forward-looking statements which include, but are not limited to, comments regarding future financings, if any, pursuant to the short form base shelf prospectus referred to above, and comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, future financings, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com.
Copyright (c) 2022 TheNewswire – All rights reserved.
News Provided by TheNewsWire via QuoteMedia
Canada Silver Cobalt Works Inc. (TSXV: CCW) (OTCQB: CCWOF) (FSE: 4T9B) (the "Company" or "Canada Silver Cobalt") announces that has entered into a non-binding letter of Intent ("LOI") dated April 20, 2022 with Power Group Projects Corp. ("PGP") which contemplates a transaction whereby PGP would sell its interest in specific Cobalt area properties (the "Property), located in Coleman, Bucke and Lorrain Townships in the Larder Lake Mining Division of Ontario to the Company. The LOI is subject to a 90-day exclusivity and due diligence period.
Under the terms of the LOI, the Company and PGP would enter into a formal agreement whereby the Company would purchase a 100% interest, subject to a 2% NSR in specific PGP Properties and the data related to the Property subject to a payment of $75,000 cash and the issuance of 300,000 shares of Canada Silver to PGP upon closing the transaction. The transaction is subject to TSX Venture Exchange acceptance.
The Properties in question are comprised of 66 claims and 21 mining and surface rights patents totalling approximately 1,000 hectares. Within the patented claims, the historic Smith Cobalt Mine sunk a shaft to a depth of 452 feet in 1930's where they worked 4 veins and produced over 500 pounds cobalt. The property is adjacent to the past-producing Deer Horn Mine where over 2.5 million ounces silver and over 88,000 pounds cobalt, 150,000 pounds copper, and 30,000 pounds nickel were recovered between 1960 and 1965. An additional million ounces of silver was estimated (but unconfirmed) to be produced from 1928 to 1942 (Silver-Cobalt-Calcite Vein Deposits of Ontario, Mineral Deposit Circular 010, Ontario Department of Mines, A.O.Sergiades, 1968).
"The purpose of this transaction would be to further strengthen the Company's battery metals portfolio and provide an additional key land package in the Cobalt Camp. This region is extremely under-explored and has experienced a long hiatus of mining in the area. Our technical team believes that this location has the necessary geological indicators and historical success to host further cobalt deposits. Using modern technology and knowledge gained from exploring satellite deposits proximal to existing mines, such as Castle East in Gowganda, we believe that this property holds strong potential," stated Gerhard Kiessling, Exploration Manager.
Qualified person
The technical information in this news release was prepared under the supervision of Mr. Matthew Halliday, P.Geo., (PGO), President, COO and VP Exploration of Canada Silver Cobalt Works Inc., a qualified person in accordance with National Instrument 43-101.
About Canada Silver Cobalt Works Inc.
Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.
In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.
The Company also has 14 battery metals properties in Northern Quebec where it is currently drilling and the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it will be exploring in 2022.
Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com
"Frank J. Basa"
Frank J. Basa, P. Eng.
Chief Executive Officer
For further information, contact:
Frank J. Basa, P.Eng.
Chief Executive Officer
416-625-2342
Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Caution Regarding Forward-Looking Statements
This news release may contain forward-looking statements which include, but are not limited to, comments regarding future financings, if any, pursuant to the short form base shelf prospectus referred to above, and comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, future financings, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/122420
News Provided by Newsfile via QuoteMedia
Foremost Lithium Resource & Technology Ltd. (CSE: FAT) (OTCQB: FRRSF) (FSE: F0R0) (WKN: A3DCC8) (www.foremostlithium.com) ("Foremost Lithium", "Foremost" or the "Company") is pleased to announce that it has completed its initial option payment under the terms of its agreement (the "Option Agreement") with Strider Resources Ltd. ("Strider") previously announced June 29, 2022, consisting of a cash payment of $100,000, and issuing 526,316 common shares to Strider. The common shares will be subject to a hold period of four months and one day from the date of issuance.
Under the terms of the Option Agreement pursuant to which the Company has the right to acquire a 100% interest in the PEG NORTH CLAIMS located in the historic Snow Lake mining district in Manitoba (the "Peg North Claims) subject only to a 2% net smelter return royalty granted to Strider (the "NSR") (the "First Option"). Once the First Option has been fully exercised, the Company may, at any time prior to commencement of commercial production on the Peg North Claims, exercise a second option to acquire one half (1/2) of the NSR (1%) for a cash payment of $1,500,000. Please refer to the Company's June 29, 2022 news release for a complete summary of the terms of the Option Agreement.
About Foremost Lithium
Foremost Lithium is a resource exploration company committed to having a critical role in the production of high-quality battery-grade lithium hydroxide to fuel the electric vehicle and battery storage market. Given the importance and global focus on increasing energy decarbonization, especially when it comes to vehicles, the Company is hyper-focused in continued exploration and growth on its five lithium projects in Manitoba being Jean Lake, Grass River, Zoro, Jol and the Peg North Claims, and its Hidden Lake lithium project in the Northwest Territories. Foremost Lithium also has an interest in the Winston Gold/Silver Project in New Mexico, USA.
For Further Information, Please Contact:
John Gravelle, President and CEO
[email protected]
Foremost Lithium Resource &Technology
1 604 330-8067
Follow us and contact us on social media:
Twitter: @foremostlithium
Linkedin: https://www.linkedin.com/company/foremost-lithium-resource-technology
Facebook: https://www.facebook.com/ForemostLithium
Forward-Looking Statements
This news release contains "forward-looking statements" and "forward-looking information" (as defined under applicable securities laws), based on management's best estimates, assumptions and current expectations. Such statements include but are not limited to, statements with respect to the changes to management of the Company, for closing of the proposed acquisition, future acquisition and dispositions of mining and exploration interests, furure financing needs and activities, the plans for future exploration and development of the Company's properties Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as ""expects", "expected", "budgeted", "forecasts" , "anticipates" "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those expressed or implied by such statements, including but not limited to: risks related to the receipt of all necessary approvals for the proposed acquisition, completion of the Company's recently announced financing, risks related to the Company's exploration properties; risks related to international operations; risks related to general economic conditions, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of commodities including lithium and gold; fluctuations in foreign currency exchange rates, increases in market prices of mining consumables, possible variations in reserves; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of exploration, development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in jurisdictions in which the Company operates. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements and forward-looking information are made as of the date hereof and are qualified in their entirety by this cautionary statement. The Company disclaims any obligation to revise or update any such factors or to publicly announce the result of any revisions to any of the forward-looking statements or forward-looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly, readers should not place undue reliance on forward-looking statements and information. Please refer to the Company's most recent filings under its profile at www.sedar.com for further information respecting the risks affecting the Company and its business.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/129933
News Provided by Newsfile via QuoteMedia
Couloir Capital has Published a New Research Note on Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (FSE: C1Z1) ("CYP" or "Company"). The report is titled, "Feasibility Study Commenced, Ongoing Pilot Plant Testing Yields Positive Results."
The report can be accessed through Couloir Capital's portal: https://www.couloircapital.com/research-portal.
Report excerpt: "CYP continues to make progress with key strategic and operational initiatives discussed in our previous update, with key objectives including:
Pilot Plant Operations: CYP continues to test extraction processes at the pilot-scale to ascertain the viability of commercial-scale processing at Clayton Valley. As CYP continues to progress on pilot testing of lithium extraction, it is also working towards advancing Clayton Valley to the next stage of the development cycle with commencement of a FS. As CYP continues to fine tune the processing methodology at its plant, we expect findings will be incorporated into the FS.
Water Rights: CYP has progressed in securing the necessary water rights needed to support commercial-scale operations, addressing a key development bottleneck.
Expanding Mineralized Footprint: CYP acquired the Clayton Valley Lithium Project of Enertopia Corp., which comprises 17 unpatented mining claims covering 160 acres. The property has a compliant resource, which comprises 82 mt of 1,121 ppm Li (indicated) and 18 mt of 1,131 ppm Li (inferred). The resource is based on four core holes drilled in 2018. By acquiring ENRT's property, CYP has consolidated Clayton Valley into a larger property and increased its mineralized base, growing potential captive feedstock for future operations.
Moving forward, we expect that the key catalysts on the horizon include further progress with the FS, additional pilot plant developments around lithium recovery, and capital structure change events. We expect these catalysts to be material if they imply advancement of CYP's project, with the most likely valuation triggers to be related to the completion of the Clayton Valley FS."
About Couloir Capital Ltd.
Couloir Capital Ltd. is an investment research firm comprised of a team of veteran investment professionals dedicated to providing world-class opportunities in the natural resource exploration and development sectors along with real and alternative asset classes and strategies.
For further information, please contact:
Robert Stitt, Managing Director, Couloir Capital Ltd.
Email: [email protected]
www.couloircapital.com
Disclosure: A service agreement exists between Couloir Capital and the Company.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/129924
News Provided by Newsfile via QuoteMedia
S andy MacDougall, CEO of Noram Lithium Corp. (" Noram " or the " Company ") (TSXV:NRM | OTCQB:NRVTF | Frankfurt:N7R) is pleased to announce the successful completion of CVZ-81 (PH-03) and release of the final assay results. The Company completed core hole CVZ-81 at a depth of 451.5 feet (137.6 m). Sampling for assay began at 55 ft (16.8 m) and continued to the bottom of the hole, an interval thickness of 416.5 ft (126.9 m) was intersected. The hole ended in mineralization and the weighted average lithium values present were as follows
CVZ-81 was the last hole drilled in Noram's Phase VI drilling program and had better than expected results, as did most of the holes in this in-fill drilling program. Now that the final assays are in, efforts are being focused on updating the geological/lithium grade models to be used in the upcoming PFS. The grades and thicknesses of mineralization seen in the Phase VI holes are anticipated to substantially improve the outlook for the Zeus deposit and upgrade approximately 175 million tonnes of the deposit from the inferred resource category to indicated resource." comments Brad Peek, VP of Exploration and geologist on all six phases of Noram's Clayton Valley exploration drilling.
Hole ID
Sample No.
From (ft)
To
(ft)
From
(m)
To
(m)
Li
(ppm)
CVZ-81
1851338
35
45
10.7
13.7
960
CVZ-81
1851339
45
55
13.7
16.8
710
CVZ-81
1851340
55
65
16.8
19.8
830
CVZ-81
1851341
65
75
19.8
22.9
750
CVZ-81
1851342
75
85
22.9
25.9
950
CVZ-81
1851343
85
95
25.9
29.0
820
CVZ-81
1851344
95
107
29.0
32.6
1000
CVZ-81
1851345
107
118
32.6
36.0
800
CVZ-81
1851346
118
123
36.0
37.5
1020
CVZ-81
No Sample
123
124.5
37.5
37.9
CVZ-81
1851347
124.5
135
37.9
41.1
950
CVZ-81
1851348
135
145
41.1
44.2
1140
CVZ-81
1851349
145
155
44.2
47.2
1110
CVZ-81
1851350
155
165
47.2
50.3
1100
CVZ-81
1851351
165
175
50.3
53.3
1750
CVZ-81
1851353
175
185
53.3
56.4
1450
CVZ-81
1851354
185
195
56.4
59.4
1170
CVZ-81
1851355
195
205
59.4
62.5
1520
CVZ-81
1851356
205
215
62.5
65.5
1540
CVZ-81
1851357
215
225
65.5
68.6
1810
CVZ-81
1851358
225
235
68.6
71.6
1510
CVZ-81
1851359
235
245
71.6
74.7
1440
CVZ-81
1851361
245
255
74.7
77.7
1490
CVZ-81
1851362
255
265
77.7
80.8
1730
CVZ-81
1851363
265
275
80.8
83.8
1380
CVZ-81
1851364
275
285
83.8
86.9
1190
CVZ-81
1851365
285
295
86.9
89.9
1200
CVZ-81
1851366
295
305
89.9
93.0
1110
CVZ-81
1851367
305
315
93.0
96.0
1140
CVZ-81
1851368
315
325
96.0
99.1
1140
CVZ-81
1851369
325
335
99.1
102.1
1030
CVZ-81
1851370
335
345
102.1
105.2
930
CVZ-81
1851372
345
355
105.2
108.2
960
CVZ-81
1851373
355
365
108.2
111.3
1140
CVZ-81
1851374
365
375
111.3
114.3
660
CVZ-81
1851375
375
385
114.3
117.3
780
CVZ-81
1851376
385
395
117.3
120.4
730
CVZ-81
1851377
395
405
120.4
123.4
770
CVZ-81
1851378
405
415
123.4
126.5
820
CVZ-81
1851379
415
425
126.5
129.5
710
CVZ-81
1851380
425
435
129.5
132.6
790
CVZ-81
1851381
435
445
132.6
135.6
840
CVZ-81
1851382
445
451.5
135.6
137.6
860
Table 1 – Sample results from CVZ-81 from 35 ft to depth of 451.5 ft (10.7-137.6 m)
The samples were analyzed by the ALS laboratory in Reno, Nevada. QA/QC samples were included in the sample batch and returned values that were within their expected ranges.
Figure 2 – Location of all past drill holes (Phase I to Phase V) previously completed in addition to the 12 holes completed for Phase VI. Phase VI holes are indicated in purple.
The technical information contained in this news release has been reviewed and approved by Brad Peek., M.Sc., CPG, who is a Qualified Person with respect to Noram's Clayton Valley Lithium Project as defined under National Instrument 43-101.
About Noram Lithium Corp.
Noram Lithium Corp. (TSXV: NRM| OTCQB: NRVTF | Frankfurt: N7R) is a well-financed Canadian based advanced Lithium development stage company with less than 90 million shares issued and a fully funded treasury. Noram is aggressively advancing its Zeus Lithium Project in Nevada from the development-stage level through the completion of a Pre-Feasibility Study in 2022.
The Company's flagship asset is the Zeus Lithium Project ("Zeus"), located in Clayton Valley, Nevada. The Zeus Project contains a current 43-101 measured and indicated resource estimate* of 363 million tonnes grading 923 ppm lithium, and an inferred resource of 827 million tonnes grading 884 ppm lithium utilizing a 400 ppm Li cut-off . In December 2021, a robust PEA** indicated an After-Tax NPV(8) of US$1.3 Billion and IRR of 31% using US$9,500/tonne Lithium Carbonate Equivalent (LCE). Using the LCE long term forecast of US$14,000/tonne, the PEA indicates an NPV (8%) of approximately US$2.6 Billion and an IRR of 52% at US$14,000/tonne LCE.
Please visit our web site for further information: www.noramlithiumcorp.com .
ON BEHALF OF THE BOARD OF DIRECTORS
Sandy MacDougall
Chief Executive Officer and Director
C: 778.999.2159
For additional information please contact:
Peter A. Ball
President and Chief Operating Officer
[email protected]
C: 778.344.4653
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, the completion transactions completed in the Agreement. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws. *Updated Lithium Mineral Resource Estimate, Zeus Project, Clayton Valley, Esmeralda County, Nevada, USA (August 2021) **Preliminary Economic Assessment Zeus Project, ABH Engineering (December 2021)
SOURCE: Noram Lithium Corp.
News Provided by ACCESSWIRE via QuoteMedia
NOT FOR DISTRIBUTION TO UNITED STATES NEWS WIRE SERVICES OR DISSEMINATION IN THE UNITED STATES
Jourdan Resources Inc. (TSX-V: JOR) (" Jourdan " or the " Company ") announces that it intends to complete a best efforts non-brokered private placement financing of (i) up to 12,500,000 units (each, a " Unit ") at a price of $0.08 per Unit for gross proceeds of up to $1,000,000, and (ii) up to 10,000,000 common shares of the Company issued on a flow-through basis (each, a " Flow-Through Share ") at a price of $0.10 per Flow-Through Share for gross proceeds of up to an additional $1,000,000 (collectively, the " Offering "). Each Unit will consist of one common share of the Company and one common share purchase warrant (each, a " Warrant "). Each Warrant entitles the holder to acquire one additional common share of the Company at an exercise price of $0.10 for a period of 24 months from issuance.
Closing of the Offering is expected to occur on or about July 15, 2022. All securities issued in connection with the Offering will be subject to a statutory hold period of four-months and one day. Completion of the Offering is subject to a number of conditions, including without limitation, receipt of TSX Venture Exchange (" TSXV ") approval. No finder's fees will be paid in connection with the Offering. The Company intends to use the net proceeds from the issuance of the Units and the Flow-Through Shares for working capital and general corporate purposes and to fund exploration expenditures on its Vallee, Preissac – La Corne and Baillarge lithium mining properties, respectively.
About Jourdan Resources
Jourdan Resources Inc. is a Canadian junior mining exploration company trading under the symbol "JOR" on the TSX Venture Exchange and "2JR1" on the Stuttgart Stock Exchange. The Company is focused on the acquisition, exploration, production, and development of mining properties. The Company's properties are in Quebec, Canada, primarily in the spodumene-bearing pegmatites of the La Corne Batholith, around North American Lithium's producing Quebec Lithium Mine.
For more information:
www.jourdaninc.com
Rene Bharti, Chief Executive Officer and President
Email: [email protected]
Phone: (416) 861-5800
Cautionary statements
This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, but is not limited to, statements with respect to the Offering, including the Company's intended use of proceeds, closing conditions and timing and other matters relating thereto. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Jourdan to be materially different from those expressed or implied by such forward-looking information, including but not limited to: receipt of necessary approvals; general business, economic, competitive, political and social uncertainties; future mineral prices; accidents, labour disputes and shortages and other risks of the mining industry. Although Jourdan has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. Jourdan does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. ![]()
News Provided by GlobeNewswire via QuoteMedia
Fortune Minerals Limited (TSX: FT) (OTCQB: FTMDF) ("Fortune" or the "Company") (www.fortuneminerals.com) reports that the nominees listed in the management information circular for the 2022 Annual General Meeting of shareholders held on June 28, 2022 (the "Meeting") were elected as directors of Fortune. Detailed results of the vote based on proxies received are set out below:
Nominee
Votes For
% For
Votes Withheld
% Withheld
Robin E. Goad
67,595,332
97.82%
1,505,753
2.18%
Glen Koropchuk
67,734,593
98.02%
1,366,491
1.98%
John McVey
67,739,525
98.03%
1,361,560
1.97%
Mahendra Naik
66,556,189
96.32%
2,544,895
3.68%
David Ramsay
65,616,270
94.96%
3,484,814
5.04%
Edward Yurkowski
67,940,000
98.32%
1,161,085
1.68%
Shareholders also approved the appointment of Fortune's auditors.
About Fortune Minerals:
Fortune is a Canadian mining company focused on developing the NICO cobalt-gold-bismuth-copper Critical Minerals project in the NWT and Alberta. Fortune also owns the satellite Sue-Dianne copper-silver-gold deposit located 25 km north of the NICO Deposit and is a potential future source of incremental mill feed to extend the life of the NICO mill and concentrator.
Follow Fortune Minerals:
Click here to subscribe to Fortune's email list.
Click here to follow Fortune on LinkedIn.
@FortuneMineral on Twitter.
View source version on businesswire.com: https://www.businesswire.com/news/home/20220629005691/en/
Fortune Minerals Limited
Troy Nazarewicz
Investor Relations Manager
[email protected]
Tel: (519) 858-8188
www.fortuneminerals.com
News Provided by Business Wire via QuoteMedia
TinOne Resources Inc. (TSX-V: TORC) (" TinOne " or the " Company ") is pleased to provide the first drill results from its Great Pyramid Tin (Sn) project located in the tier one mining jurisdiction of Tasmania, Australia .
Results have been received for 764 metres of the Company's ongoing 5,500 metre drilling program at its Great Pyramid project in Tasmania, Australia . These results represent complete results for seven Reverse Circulation (RC) drill holes and partial results for one additional RC hole. Assays are being fast tracked and average laboratory turnaround to-date has been 23 days.
Drilling commenced at the Great Pyramid project on April 27, 2022 , with three drill rigs currently operating on site, including two Diamond (DD) rigs and one RC rig. The initial program consists of approximately 5,500 metres and has several objectives:
"We are extremely pleased to report our first results from our Great Pyramid tin project so quickly after listing," commented Chris Donaldson , Executive Chairman. "The results have demonstrated robust grade continuity within the historical resource at grades equal to or above historical grades. In addition, the results provide further confidence that mineralisation extends below the historical resource. Ongoing work will fill gaps in the data coverage, particularly at depth, and allow us to develop our grade distribution model and build our geological interpretation to integrate with the extensive historical database."
Results reported here are predominantly from the upper portions of the project area within the historical resource 1 area and demonstrate consistent tin grades over substantial thicknesses (Table 1). Mineralised intersections were also encountered beneath the historical resource 1 area (Table 1, Figure 3) and demonstrate that in certain areas mineralisation extends to depth below the historical resource 1 area, consistent with historical drill data 2 .
In addition to the RC drill results reported here, an additional 1,102 metres of diamond drilling has been completed within, lateral to and beneath the historical resource area. Drill core processing is underway with an initial 209 metres of core despatched to the laboratory. To-date these diamond holes have intersected alteration and mineralisation over variable thicknesses up to 120m beneath the historical resource area (Figures 4, 5, 6).
Table 1: Great Pyramid RC drill results. More significant results are shown in bold.
Hole
Intersection
Width (m)
From
(m)
Sn%
Comments
22GPRC002
14
3
0.18
On margin of historical resource area.
22GPRC002
6
24
0.22
On margin of historical resource area.
22GPRC002
3
56
0.15
On margin of historical resource area.
22GPRC003
39
3
0.25
Within historical resource area.
22GPRC003
7
32
0.19
Within historical resource area. Diamond tail to be completed.
22GPRC004
17
41
0.13
Within and beneath historical resource area.
22GPRC004
5
62
0.14
Beneath historical resource area.
22GPRC004
3
87
0.22
Beneath historical resource area.
22GPRC004
3
124
0.16
Beneath historical resource area to end of hole. Diamond tail to be completed.
22GPRC005
3
8
0.30
Within historical resource area.
22GPRC005
23
15
0.29
Within historical resource area.
22GPRC005
5
54
0.18
Beneath historical resource area.
22GPRC005
15
72
0.14
Beneath historical resource area.
22GGRC005
4
112
0.21
Beneath historical resource area. Diamond tail to be completed.
22GPRC006
9
48
0.20
Beneath historical resource area.
22GPRC006
7
65
0.21
Beneath historical resource area.
22GPRC006
4
76
0.19
Beneath historical resource area.
22GPRC006
30
84
0.19
Beneath historical resource area. Diamond tail to be completed.
22GPRC007
21
2
0.30
Within historical resource area. To end of hole. Hole intersected historic underground working. To be redrilled.
22GPRC009
3
102
0.19
Beneath historical resource area. Redrilled with diamond tail to be completed.
22GPRC011
5
1
0.41
Partial results only, remaining results pending.
NOTES: All intersections are calculated with a cut-off grade of 0.1% Sn with maximum consecutive internal waste of 3 metres.
All intersections are downhole widths, true widths are uncertain.
TinOne drill hole numbering is in the form 22GPRCXXX for RC holes and 22GPRDDXXX for diamond holes with numbering allocated in sequence.
Analytical results have been received for holes 22GPRC002, 003, 004, 005, 006, 007, 009 and partial 011.
Diamond holes completed to-date and with assays pending are 22GPDD001, 22GPDD001A (redrill of 22GPDD001 which was abandoned at 42.1m), 22GPDD008, 22GPDD10 and 22GPDD015.








The Great Pyramid deposit is located around a topographical feature known as Pyramid Hill and is hosted by Silurian to Devonian Mathinna Supergroup sandstones. The mineralization is formed by closely spaced sheeted northeast trending, cassiterite (SnO₂) bearing veins associated with silicification and sericite-pyrite alteration. The deposit style and regional comparisons suggests that a tin-fertile granite exists at depth below the deposit, however this has not been encountered in drilling and the deposit is open at depth. Geological interpretation indicates that certain sedimentary units within the folded Mathinna Supergroup sediments are more favourable hosts and diamond drilling being undertaken by the Company during the current campaign, combined with numerical modelling, will assist in developing a deeper understanding of controls on grade for follow up drilling.
The deposit is currently known over a strike length of more than 500 metres with an average width of approximately 150 metres. The depth extent of the deposit is unknown with only nine historical drill holes greater than 150 metres deep. These rare deeper holes encountered encouraging tin mineralization to depths of approximately 300 metres below surface 2 .
The previous owners of the Great Pyramid project estimated an Inferred Resource reported under the JORC 2012 guidelines. This resource contains approximately 10,000 tonnes of tin at a grade of 0.2% tin (Table 2). The estimation utilised close spaced historic percussion (~85%) and lesser diamond drill holes with drill spacing in the estimation area typically 15 x 30m and locally closer. Although the resource is defined by close spaced drilling, the resource was classified by the previous owners as Inferred due to the historic nature of the data. The estimate was reported in the independent geological report prepared by Mining One Pty Ltd for TNT Mines Ltd, dated June 26, 2017 .
Table 2: Great Pyramid Historical Inferred Mineral Resource 1
Great Pyramid Inferred Mineral Resource – JORC 2012
Sn% CUT OFF
TONNES (Mt)
GRADE (Sn%)
CONTAINED TIN (kt)
0.1
5.2
0.2
10.4
The Inferred Resource was estimated using Multiple Indicator Kriging method of 1.5 metre down-hole composites within a mineralized domain interpreted from tin grade. The estimate is restricted to the area of close spaced drilling and 90% of the resource occurs within 40 metres of surface. Although the limited deeper drilling has encountered mineralized material this was not included in the resource. Additional drilling utilising modern drill techniques, analytical techniques and QA/QC will be required to re-estimate the resource and report under NI 43-101.
1 The reader is cautioned that the above referenced "Inferred Resource" estimates are considered historical in nature and are based on prior data and reports prepared by previous property owners. A qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves and TinOne is not treating the historical estimate as current mineral resources or mineral reserves. Significant data compilation, re-drilling, re-sampling and data verification may be required by a qualified person before the historical estimate on the Great Pyramid property can be classified as a current resource. There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability. Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured mineral resource category.
2 Data regarding historical drilling is sourced from Mineral Resources Tasmania online database (MRTMap). In addition, data for 18GPD001 has been sourced from a public announcement by previous owners TNT Mines, November 15, 2018 . However, the "historical drill data" are considered historical in nature and are based on prior data and reports prepared by previous property owners. A qualified person has not done sufficient work to classify the historical data as current and TinOne is not treating the historical data as current. There can be no assurance that any of the historical drill data is representative.
Drill core and RC samples were shipped to ALS Limited in Brisbane, Australia for sample preparation and for analysis. The ALS, Brisbane facilities are ISO 9001 and ISO/IEC 17025 certified. Tin and tungsten are analysed by ICP-MS following lithium borate fusion (ALS method ME-MS85), overlimit results are reanalysed by XRF (ALS method XRF15b). Forty-eight element multi-element analyses are conducted by ICP-MS with a four-acid digestion (ALS method ME-MS61).
Control samples comprising certified reference samples, duplicates and blank samples were systematically inserted into the sample stream and analyzed as part of the Company's quality assurance / quality control protocol.
TinOne is a TSX Venture Exchange listed Canadian public company with a high-quality portfolio of tin projects in the Tier 1 mining jurisdictions of Tasmania and New South Wales, Australia . The Company is focussed on advancing its highly prospective portfolio while also evaluating additional tin opportunities. TinOne is supported by Inventa Capital Corp.
The Company's disclosure of technical or scientific information in this press release has been reviewed and approved by Dr. Stuart Smith ., Technical Adviser for TinOne. Dr. Smith is a Qualified Person as defined under the terms of National Instrument 43-101.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release includes certain "Forward‐Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward‐looking information" under applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and similar words or expressions, identify forward‐looking statements or information. These forward‐looking statements or information relate to, among other things: the development of the Company's projects, including drilling programs and mobilization of drill rigs; future mineral exploration, development and production; the release of drilling results; and completion of a drilling program.
Forward‐looking statements and forward‐looking information relating to any future mineral production, liquidity, enhanced value and capital markets profile of TinOne, future growth potential for TinOne and its business, and future exploration plans are based on management's reasonable assumptions, estimates, expectations, analyses and opinions, which are based on management's experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things, the price of gold and other metals; no escalation in the severity of the COVID-19 pandemic; costs of exploration and development; the estimated costs of development of exploration projects; TinOne's ability to operate in a safe and effective manner and its ability to obtain financing on reasonable terms.
These statements reflect TinOne's respective current views with respect to future events and are necessarily based upon a number of other assumptions and estimates that, while considered reasonable by management, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward‐looking statements or forward-looking information and TinOne has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the Company's dependence on early stage mineral projects; metal price volatility; risks associated with the conduct of the Company's mining activities in Australia ; regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside contractors; risks regarding mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate sufficient cash flow from operations; risks relating to project financing and equity issuances; risks and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources, metallurgical recoveries and capital and operating costs of such projects; contests over title to properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and safety; the ability of the communities in which the Company operates to manage and cope with the implications of COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's interactions with surrounding communities and artisanal miners; the Company's ability to successfully integrate acquired assets; the speculative nature of exploration and development, including the risks of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and the factors identified under the caption "Risk Factors" in TinOne's management discussion and analysis. Readers are cautioned against attributing undue certainty to forward‐looking statements or forward-looking information. Although TinOne has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. TinOne does not intend, and does not assume any obligation, to update these forward‐looking statements or forward-looking information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law. 
SOURCE TinOne Resources Corp.
View original content to download multimedia: http://www.newswire.ca/en/releases/archive/June2022/29/c0998.html
News Provided by Canada Newswire via QuoteMedia
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.