New downtown Raleigh apartments to have sky-lounge, coworking space – Triad Business Journal – The Business Journals

Sep 08, 2022 by The Beat Maker - 0 Comments

Kane Realty Corp. has revealed new plans for the next phase of a large development that’s reshaping part of downtown Raleigh.
The Raleigh-based real estate developer on Friday announced it will construct a mix-used project with over 200 apartments plus retail space as part of its ongoing West End development. The unnamed project will sit on a little over two acres at the corner of South West and West Cabarrus streets, across the railroad tracks from the Warehouse District.
Kane anticipates groundbreaking for summer 2023 and completion in spring 2025. An estimated cost was not released.
The new project joins Platform, Kane’s first development in the West End at the site of the former Clancy & Theys headquarters at 600 W. Cabarrus St. Platform will be a 7-story multi-building project with more than 430 apartments over 26,000 square feet of ground-floor retail space. That project is currently under construction and scheduled to open in January 2024.
The new, unnamed project will have 240 apartments, 290 parking spaces and 4,000 square feet of retail space. The building will be five floors of residences on top of two floors of parking while the retail will be at street level.
“Downtown Raleigh has seen tremendous growth over the past several years, with no signs of slowing down,” said Bonner Gaylord, chief operating officer at Kane Realty. “West End is a vibrant neighborhood with a fantastic variety of locally owned businesses. Between Platform and this newest development, we are thrilled to introduce even more options to live, work, dine, and shop in downtown’s West End.”
Originally, Kane thought about making the second development a mixed-use office project but started changing course toward mixed-use residential in 2021.
The apartments will be a mix of studio, one-, two- and three-bedroom units. Amenities will feature a top-floor sky lounge with views of downtown Raleigh, a pool with sundeck, indoor and outdoor community and coworking spaces and a fitness center.
The other development in the West End project is the West Carrabus Warehouses, where plans are to renovate two industrial buildings at 518 S. West St. into a retail and dining hub.  
Plans for phase two of Kane’s Park City South development with Merge Capital were released in March. Phase two will be a 20-story mixed-use tower with apartments and street-level retail. Park City South is adjacent to Dorothea Dix Park. Construction was slated to start by the end of this year.
© 2022 American City Business Journals. All rights reserved. Use of and/or registration on any portion of this site constitutes acceptance of our User Agreement (updated January 1, 2021) and Privacy Policy and Cookie Statement (updated July 1, 2022). The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of American City Business Journals.

source

Leave a Comment